BIOGUARD · GRID INTELLIGENCE
BLOG · 2026

Satellite + LiDAR
one interface, one decision

Two data sources — previously two platforms. Now one.

The Classic Workflow

🛰️

SATELLITE

Where did it grow?
Continuous validation
VS
📡

LiDAR

How much did it grow?
Ad hoc survey

BioGuard Solution

One interface, two layers, one engineering decision

SENTINEL-2 Satellite NDVI · 2D map LiDAR Point Cloud 3D · cm-level accuracy BioGuard FUSION + AI ANALYSIS HC0 · HC1 · HC2 · HC3 — intervention priority
Satellite monitoring view

🛰️ SATELLITE · continuous monitoring

LiDAR 3D point cloud view

📡 LiDAR · cm-accurate point cloud

The same corridor — two sensors, two logics

01

Powerline topology in the point cloud

Tower marking · network building
LiDAR point cloud with tower marking
5 towers · 379 m
1.22M points · 11.88 ha · 248 m corridor
02

Satellite + LiDAR in one view

Left: where · Right: what
Satellite map and 3D LiDAR point cloud in one view
3 urgent
4 sections · NDVI 2015 → 2025: +0.10 · vegetation +2.6 m

But this is not free. What does the cost picture look like?

Two different logics, two different pricing models

★ IMPORTANT
📡

LiDAR survey

€€€€
SIGNIFICANT INVESTMENT
  • Pinpoint, centimeter-level geometry
  • 3D powerline - vegetation clearance
  • One point in time - a snapshot
  • Expensive to repeat · drone rental, permits
🛰️

Satellite monitoring

€
COST-OPTIMIZED
  • Continuous · new imagery every 5 days
  • NDVI, vitality, biodiversity - things LiDAR cannot see
  • The entire network can be covered
  • No centimeter-level height data
Prisoner's dilemma? You have to choose.
NO. A rational decision that each DSO makes for itself.
BioGuard does not force a choice. We provide both alternatives - and, in practice, the combined use of both, creating the synergies.

The satellite tells us where to look.
LiDAR tells us what to do.

03

AI analysis by section

T3 → T4 · 1226 m · HC1 monitor
LiDAR analysis report - Risk Score 47/100 Sentinel-2 trend report - HC escalation 2015-2030

Left: LiDAR analysis · 84,046 points · Risk Score 47/100 · Right: Sentinel-2 trend · NDVI +22% · 2015→2030 HC escalation

+3.2 m
vegetation growth over 10 years · rescan in 12 months
04

Engineering-grade 3D measurement

Point-to-point · powerline - ground clearance
3D measurement in the point cloud
53.21 m
3D distance · 50.48 m horizontal · 16.82 m elevation difference

Evaluating One Corridor

OLD
2-3 weeks of manual workflow
~21 days
BIOGUARD
3 minutes
3 minutes

What This Means for the DSO

Three concrete impacts

×100
SPEED

Time

2-3 weeks of manual workflow → minutes

100%
LOCAL

Data sovereignty

NIS2 compliant · stays on the DSO server

HC0—3
DECISION

Clarity

Intervention priority · direct budget input

Demo on Your Own Network

5-10 km sample section · analysis within 48 hours

Request a Demo →